other

We implement a 5-step QC protocol for every unit:

1. Vacuum Leak Testing (static and dynamic pressure holding);

2. Jacket Pressure Testing (hydraulic pressure validation);

3. Agitation System Run-in (continuous motor testing);

4. Temperature Control Calibration (matched with chiller/heater);

5. Final Inspection (appearance, labels, documentation).

Multi-Level Quality Testing

leave a message

leave a message
For any request of information or technical support, fill in the form. All fields marked with an asterisk* are required.
Submit
Contact us :
+86 -13053083981

Home

Products

WhatsApp

contact